  | 
                      Downtimes 
                        Eliminate unplanned downtimes  is very important to improve OEE. With   downtime analysis  and reason codes associated to each downtime (Root cause   analysis) is indispensable to identify and minimize/eliminate the downtime main   reasons                          | 
                        | 
                        | 
                      Small stop times and reduced speed 
                          These are the most difficult to monitor and register. The cycle time analysis must be used to find these losses.  | 
                    
                    
                        | 
                      Adjustments time 
                          Monitoring of startup times, adjustments times, test times, etc. is critical to reduce this loss. The analysis of these times will help reduce and improve the productivity in your processes  | 
                        | 
                        | 
                      Production and startup rejects 
                          Rejects tracking when they occur in a shift or in a production order can help to identify the potential causes and in many cases, many patterns will be discovered.  |